Overview
Aquila Nickel Group is committed to developing world-class nickel processing operations in Sulawesi, utilizing the latest pyrometallurgical and hydrometallurgical technologies. Our approach integrates sustainable practices and community empowerment as core pillars of long-term growth.
The Group secures its feedstock from wholly owned mine in Sulawesi : Bahomoahi (PT Sulawesi Resources), Sorawolio (PT Bumi Inti Sulawesi), and Asera (PT Bumi Konawe Minerina). Combined geological resources exceed 50 million wmt of saprolite ore for pyrometallurgical production and 40 million wmt of limonite ore suitable for hydrometallurgical processing.
At full capacity, the Aquila Project is forecast to deliver up to 40,000 tons of nickel annually in different product forms, produced directly on Sulawesi Island to support Indonesia’s downstream industrial energy.
aquila
PT Aquila Cobalt Nickel
Area120+hectare
Nickel50,000,000+ Saprolite Orewet metric tons
Cobalt40,000,000+ Limonite Orewet metric tons
Location Central Sulawesi – Morowali Existing infrastructure Port, Road and Camp.
National power grid connection to be available in 2023.
Overview
The Aquila Project will focus on nickel ore processing. The project will source nickel ore from the Groups own mines located in Sulawesi : Bahomoahi (PT Sulawesi Resources), Sorawolio (PT Bumi Inti Sulawesi), and Asera (PT Bumi Konawe Minerina).
Comprehensive geological resources for the project are estimated to exceed 50 ml wmt of saprolite material for pyrometallurgical processing and 40 ml wmt of limonite material suitable for hydrometallurgical processing.
sorawolio
PT Bumi Inti Sulawesi
Area1,200+ Hahectare
Nickel6+ mln @ 1.8%wet metric tons
Cobalt-147.495wet metric tons
Commodity Nickel Location Bau Bau – Buton Island Drilling 2,600+ holes (over 40,000 m)
Overview
The Group has been holding rights to the Sorawolio deposit on Buton Island from 2009. The property has advanced mining infrastructure, completed initial stripping, and is located in a remote area.
Reserves & Resources
The Sorawolio deposit has an attractive amount of high-grade nickel ore resources with a high S/M ratio. These resources will be utilized for blending of feed material to the Aquila Project.
asera
PT Bumi Konawe Minerina
Area2,000hectare
Nickel14.5 mln @ 1.8%wet metric tons
Commodity Nickel Location North Konawe – Sulawesi Drilling 3,900+ holes (over 74,000 m)
Overview
The mine is located in North Konawe, Sulawesi. Medium quality ores are mined and supported by several ore storage areas, jetty for loading, access roads, and other supplementary infrastructure.
Reserves & Resources
Asera deposit has an estimated resource base of up to 14.5 million wet metric tons of nickel ore at an average nickel grade of 1.8%. Historically ore from Asera has been successfully sold to multiple local processing plants as well as for export.
bahomoahi
PT Sulawesi Resources
Area1,400+ Hahectare
Nickel19+ mln @ 1.8% Niwet metric tons
Cobalt50+ mln @0.1% Co & 1.1%Niwet metric tons
Commodity Nickel, Cobalt Location Morowali – Central Sulawesi Drilling 2,800+ holes (over 50,000 m) Deposit 1.8% Nickel Ore, Up to 14,5 Million WMT
Overview
Bahomoahi deposit is located in a mountainous region of Morowali, Central Sulawesi. The project has developed infrastructure to support the Aquila Project processing facility. All necessary permits are in place to commence mining operations.
Reserves & Resources
Designated as the primary ore source for the Aquila Project, the Bahomoahi deposit has a significant resource base to support RKEF and HPAL processing facilities for over 10+ years.
Integrity in Action, Excellence in Nickel, Empowering Communities